Dragonfly Environmental

Coolibah Reserve Riparian Rehabilitation and Wetland Design, planting and maintenance 2010 – 2011

Leave a comment

Mia 6

Working for Rockdale City Council during the 2010 – 2011 period, Dragonfly Environmental were involved in the creek bank restoration and were responsible for all the riparian planting and the on-going maintenance.  The wetland and creek works have been recognised by the Sydney Metropolitan Catchment Management Authorities and others as exceptional.

Mia 6A

Dragonfly Environmental also designed a wetland for Coolibah Reserve transforming a weedy puddle into a wetland dominated by native aquatic plants and surrounded by terrestrial native species.

Author: Geraldene

I'm passionate about People and their Connection to the Natural World. To supporting projects and ideas that result in Earth Care and harmony. I'm very interested in Indigenous Wisdoms. I'm a mum of two lovely kids, daughter and friend. I love travelling and meeting people. I am keen on being responsible and creating the world around me.

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s